Update stability test page
Include results for - Daily Guilin CI page - 24 HC test - 6 days basic_vm test Issue-ID: INT-1776 Signed-off-by: mrichomme <morgan.richomme@orange.com> Change-Id: I219b87f1275e2ff48a2d4ffeecd6dc3a4fbbae11
Diffstat (limited to 'docs/repo-onap-integration-ci.rst')
-rw-r--r--docs/repo-onap-integration-ci.rst131
1 files changed, 0 insertions, 131 deletions
diff --git a/docs/repo-onap-integration-ci.rst b/docs/repo-onap-integration-ci.rst
deleted file mode 100644
index 150c82b40..000000000
--- a/docs/repo-onap-integration-ci.rst
+++ /dev/null
@@ -1,131 +0,0 @@
-.. _integration-ci:
-
-:orphan:
-
-Integration Continuous Integration Guide
-----------------------------------------
-
-.. important::
- Continuous Integration is key due to the complexity of the ONAP projects.
- Several chains have been created:
-
- - Daily stable chain
- - Daily master chain
- - Gating: On demand deployment of a full ONAP solution to validate patchsets
-
-They are run on different environments (Orange labs, DT labs, Azure Cloud).
-
-The following document will detail these chains and how you could set up such
-chains and/or provide test results to the community.
-
-Integration CI Ecosystem
-------------------------
-
-Overview
-~~~~~~~~
-
-The global ecosystem can de described as follows:
-
-.. figure:: files/CI/ONAP_CI_10.png
- :align: center
-
-Several chains are run in ONAP.
-The CI chains are triggered from different CI systems (Jenkins or gitlab-ci) (1)
-on different target environments hosted on community labs (Windriver,
-Orange, DT, E///) or Azure clouds. Jobs (installation, tests) are executed on
-these labs (2). At the end, the results are pushed through the OPNFV test API (3)
-to a test database (4) hosted by Linux Foundation on
-http://testresults.opnfv.org.
-Results can be reported in different web pages hosted on LF or on gitlab.com (5).
-
-
-Daily Chains
-~~~~~~~~~~~~
-
-CI daily chains (Master and last Stable) are run on Orange, DT using gitlab-ci
-jobs and Ericsson using jenkins jobs.
-
-Gating
-~~~~~~
-
-OOM gating has been introduced for El Alto. It consists of a deployment followed
-by a set of tests on patchsets submitted to OOM repository.
-
-The CI part is managed on gitlab.com and the deployment is executed on ONAP
-Orange lab and Azure clouds.
-The goal is to provide a feedback - and ultimately to vote - on code change
-prior to merge to consolidate the OOM Master branch.
-
-The developer can evaluate the consequences of his/her patchset on a fresh
-installation.
-
-The gating is triggered in 2 scenarios:
-
- - new patchset in OOM
- - comment with the magic word **oom_redeploy** is posted in the Gerrit's comment
- section
-
-The procedure to submit new feature in CI is done in 3 steps as described in the
-figure below:
-
-.. figure:: files/CI/ONAP_CI_0.png
- :align: center
-
-
-Visualization of the CI pipelines
-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
-
-As the CI chains are triggered from different systems, several web interfaces
-can be used to visualize them.
-
-A web site has been created to centralize the links on http://testresults.opnfv.org/onap-integration/index.html
-
-For Gating and gitlab.com based CI chains, the pipelines consist in pipelines of
-pipelines managed through the chaining of .gitlab-ci.yml file thanks to an Open
-Source deployment called chained-ci (https://gitlab.com/Orange-OpenSource/lfn/ci_cd/chained-ci).
-A visualization tool is available to list all your chains as described in the
-figure below:
-
-.. figure:: files/CI/ONAP_CI_1.png
- :align: center
- :width: 10in
-
-If you click on any element of the chain, you will open a new window:
-
-.. figure:: files/CI/ONAP_CI_2.png
- :align: center
-
-In order to provide the logs to the developer an additional web page has been
-created to summarize the tests and grant access to their associated logs:
-
-.. figure:: files/CI/ONAP_CI_8.png
- :align: center
- :width: 6.5in
-
-Additionnaly, for the daily chain, another page displays the results as time
-series, allowing to see the evolution of the tests over time.
-
-.. figure:: files/CI/ONAP_CI_9.png
- :align: center
- :width: 6.5in
-
-
-Setup Your Own CI Chains
-------------------------
-
-If you want to setup a gitlab.com based CI chain, and want to use chained-ci,
-you can follow the tutorial on https://gitlab.com/Orange-OpenSource/lfn/ci_cd/chained-ci-handson
-
-You should be able to chain your automation projects:
-
-* Create resources
-* Deployment of Kubernetes
-* Test of your Kubernetes (using OPNFV functest-k8s tests)
-* Deployment of your ONAP (you can use your own automatic installation
- procedure or https://gitlab.com/Orange-OpenSource/lfn/onap/onap_oom_automatic_installation/)
-* Test ONAP thanks to the differnet ONAP xtesting dockers covering infrastructure
- healthcheck, components healthcheck tests, end to end tests, security tests.
-
-If you want to report your results to the community, do not hesitate to contact
-the integration team. The Test database is public but the pods must be declared