summaryrefslogtreecommitdiffstats
path: root/docs/Chapter1.rst
diff options
context:
space:
mode:
Diffstat (limited to 'docs/Chapter1.rst')
-rw-r--r--docs/Chapter1.rst26
1 files changed, 17 insertions, 9 deletions
diff --git a/docs/Chapter1.rst b/docs/Chapter1.rst
index 268b569..1c3481d 100644
--- a/docs/Chapter1.rst
+++ b/docs/Chapter1.rst
@@ -22,7 +22,8 @@ VNF Package Information Element Present
Summary
^^^^^^^
-This test case validates whether information elements corresponding to VNF requirements are present in the VNF Package
+This test case validates whether information elements corresponding to
+VNF requirements are present in the VNF Package
ONAP Actors (VNF, Operator, ONAP Platform components etc.)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
@@ -36,19 +37,22 @@ Preconditions (ONAP, VNF states, test equipment/ data patterns, measurements)
1. VNF Package available
2. VNF Requirements related to VNF Package identified (Mandatory or Optional)
-3. Information Elements corresponding to these VNF Package requirements identified
+3. Information Elements corresponding to these VNF Package requirements
+ identified
Operational sequence (e.g. Message Sequence chart + text explanations)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
-1. Search the VNF Package for the Presence/ Absence of each Information Element identified in the VNF Package requirements.
+1. Search the VNF Package for the Presence/ Absence of each
+ Information Elementidentified in the VNF Package requirements.
2. Flag as an error any Mandatory information Elements that are missing
-3. Report and optional Information Elements that are present.
+3. Report and optional Information Elements that are present.
Post conditions (any post processing of the measurements, any cleanup of the ONAP configuration, reset of the test equipment etc.)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
-1. Generate consolidated report on presence/Absence of Information Elements identified in VNF Requirements
+1. Generate consolidated report on presence/Absence of Information Elements
+ identified in VNF Requirements
Test Result decision ( measurement decision criteria )
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
@@ -62,7 +66,8 @@ VNF Package Information Element within Range Limits
Summary
^^^^^^^
-This test case validates whether information elements corresponding to VNF requirements are present in the VNF Package
+This test case validates whether information elements corresponding
+to VNF requirements are present in the VNF Package
ONAP Actors (VNF, Operator, ONAP Platform components etc.)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
@@ -76,19 +81,22 @@ Preconditions (ONAP, VNF states, test equipment/ data patterns, measurements)
1. VNF Package available
2. VNF Requirements related to VNF Package identified (Mandatory or Optional)
-3. Information Elements corresponding to these VNF Package requirements identified
+3. Information Elements corresponding to these VNF Package requirements
+ identified
4. Range Limits for Information Elements identified
Operational sequence (e.g. Message Sequence chart + text explanations)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
-1. Search the VNF Package for the Presence/ Absence of each Information Element identified in the VNF Package requirements.
+1. Search the VNF Package for the Presence/ Absence of each Information
+ Element identified in the VNF Package requirements.
2. Flag as an error any Mandatory information Elements that are missing
Post conditions (any post processing of the measurements, any cleanup of the ONAP configuration, reset of the test equipment etc.)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
-1. Generate consolidated report on presence/Absence of Information Elements identified in VNF Requirements
+1. Generate consolidated report on presence/Absence of Information Elements
+ identified in VNF Requirements
Test Result decision ( measurement decision criteria )
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^