summaryrefslogtreecommitdiffstats
path: root/bpmn/MSOInfrastructureBPMN/src/main/resources
AgeCommit message (Collapse)AuthorFilesLines
2017-10-20Flows fail to update status in requests DBRob Daugherty11-11/+11
The fallout and completion handlers are not updating the request status in the mso_requests database. The cause is a missing URN mapping that defines the service endpoint for these updates. Issue: SO-230 Change-Id: I5b4ff6e9ca2cde6605b3ed7cb7b086041111d31c Signed-off-by: Rob Daugherty <rd472p@att.com>
2017-10-17Removed unWanted methodseshukm1-37/+19
IssueId: SO-222 Change-Id: I03b66e901b57ce68c0685c054c4744a2726c1c42 Signed-off-by: seshukm <seshu.kumar.m@huawei.com>
2017-10-17fix method name mismatch create E2E svcseshukm1-40/+42
IssueId: SO-222 Change-Id: Ibcdf8c95dfa789619214745edd54393e8340d5ee Signed-off-by: seshukm <seshu.kumar.m@huawei.com>
2017-10-13Fix wrong work flow for service deletec001491072-172/+351
Fix wrong work flow for service delete bpmn logic Change-Id: I86287cc484b85ed0a31fcf70bea9049d896ade91 Issue-ID:SO-218 Signed-off-by: c00149107 <chenchuanyu@huawei.com>
2017-10-13Correct the workflow for NS Createc001491072-67/+149
Correct the workflow for NS Create bpmn Change-Id: I71283c88a3936d1b19b3403f6940823875405c90 Issue-ID:SO-217 Signed-off-by: c00149107 <chenchuanyu@huawei.com>
2017-10-11Add junit test coverage and fix bugs in VCPEJim Hahn6-384/+297
Added additional junit tests for VCPE and fixed bugs that were found while testing. Change-Id: Icb6a0c936a16b775ff553c11cb07a4348bd9ebfc Issue-ID: SO-210 Signed-off-by: Jim Hahn <jrh3@att.com>
2017-10-11Merge "Add progress for create workflow"Seshu Kumar M2-42/+144
2017-10-11Add progress for create workflowc001491072-42/+144
Add progress and operation content for create workflow operation Change-Id: Ib48ab5be7f65a039813db1da816dbe7ac4c0e6f1 Issue-ID:SO-206 Signed-off-by: c00149107 <chenchuanyu@huawei.com>
2017-10-10Fix E2E flow process namesRob Daugherty2-2/+2
DeleteCustomE2EServiceInstance and DoCustomDeleteE2EServiceInstance both declared their names to be "Process_1". I've changed their process names. Issue: SO-200 Change-Id: Ic1fd302a38c27d0d3a1a8200b4002a55fa0625f8 Signed-off-by: Rob Daugherty <rd472p@att.com>
2017-10-10Add errorRef to DeleteCustomE2EServiceInstanceRob Daugherty1-2/+3
Every throwing event needs an errorRef element. Issue: SO-200 Change-Id: I29fe145912e38cb8697638926c4b1766047195f2 Signed-off-by: Rob Daugherty <rd472p@att.com>
2017-10-10Adding BPMN and Groovy for E2E Svcseshukm2-0/+713
IssueId: SO-200 Change-Id: Idf3f9d0f64d0942ca6d004928b788c14a1605a77 Signed-off-by: seshukm <seshu.kumar.m@huawei.com>
2017-10-02Fixes for Infrastructure module startupArthur Martella1-5/+6
Excluding jersey-all from pom.xml and fixing broken bpmn file. Change-Id: I466a593f08d20f6b37e367f3ccc67bd8a7165029 Issue-ID: SO-160 Signed-off-by: Arthur Martella <amartell@research.att.com>
2017-09-27service-topology-operation黄卓垚101122151-34/+236
Change-Id: I26b03516eb73689f806aa9ea5f1edcb22a1c4d84 Issue-ID: SO-88 Signed-off-by: Zhuoyao Huang <10112215@zte.com.cn> Discription: Network-topology-operation should work with Service-topology-operation. This commit is for the Service-topology-operation.
2017-09-25Change bpmn file nameZhuoyao Huang2-2/+2
Change-Id: I4de255105cb9b1b7ac536738d0aef9655d147007 Issue-ID: SO-88 Signed-off-by: Zhuoyao Huang <10112215@zte.com.cn>
2017-09-23Merge "underlay vpn"Chuanyu Chen1-0/+90
2017-09-22underlay vpnZhuoyao Huang1-0/+90
Change-Id: I3eafc44ca701f02921dfe14a2714948cd1c21c2d Issue-ID: SO-88 Signed-off-by: Zhuoyao Huang <10112215@zte.com.cn>
2017-09-22Fix for lack of flow conditionSeshu-Kumar-M1-101/+26
condition corrected for the gate SO-158 Change-Id: I10308d9062e7d28acb415310f85505eb561b467e Signed-off-by: Seshu-Kumar-M <seshu.kumar.m@huawei.com>
2017-09-22Add delete VFC NS workflowc001491071-0/+257
Add delete VFC NS workflow bpmn and groovy file Change-Id: I9ac362ea973139663fbe8235e5ac15e980376bb6 Issue-ID:SO-57 Signed-off-by: c00149107 <chenchuanyu@huawei.com>
2017-09-21Initial commit of vCPE flowsRob Daugherty8-0/+5863
Note: vCpeResCust isn't done yet. Waiting for Homing BB integration. Change-Id: I9c6bcbd13eb1857085cb44d9aabe96ffb600b9a1 Issue-id: SO-147 Signed-off-by: Rob Daugherty <rd472p@att.com>
2017-09-21Merge "Adding Underlay VPN"Seshu Kumar M1-71/+48
2017-09-21Add NS Create Taskc001491071-120/+114
Add the details task of NS create workflow Change-Id: Ic3ee8c2659ae2cdc9b91b5eaf318dd655d87f711 Issue-ID:SO-57 Signed-off-by: c00149107 <chenchuanyu@huawei.com>
2017-09-21Adding Underlay VPNSeshu-Kumar-M1-71/+48
Adding network id before Underlay VPN in E2E svc creation IssueId: SO-152 Change-Id: If6311914633c7247b62362ca9371c54c426889bc Signed-off-by: Seshu-Kumar-M <seshu.kumar.m@huawei.com>
2017-09-20Fix duplicate service instance idsSeshu-Kumar-M3-215/+171
IssueId: SO-146 Change-Id: I483f96eea7be409546ebc5c84e2332b2992672e7 Signed-off-by: Seshu-Kumar-M <seshu.kumar.m@huawei.com>
2017-09-20Add subprocess for NS createc001491071-0/+258
Add VFC NS create sub work flow Change-Id: I503419f89633a0f74a887bc3b95fbaa3acdbfd02 Issue-ID:SO-57 Signed-off-by: c00149107 <chenchuanyu@huawei.com>
2017-09-20Add E2E service BPMNs resolve conflictsSeshu-Kumar-M3-145/+409
IssueId:SO-56 Change-Id: Icb04ea102b1fe497d8827eac582b28a472bbb836 Signed-off-by: Seshu-Kumar-M <seshu.kumar.m@huawei.com>
2017-09-19BPMN applications not deployed properlyRob Daugherty3-6/+27
Since the 1710 MSO merge the following problems exist: The workflow applications are not deployed properly. I've also fixed a few small issues with the CreateCustomE2EServiceInstance flows that prevented them from being deployed. Change-Id: Ia4f7a6de87abbc99e80c0e9083e2175cdf9b4fe5 Issue-id: SO-148 Signed-off-by: Rob Daugherty <rd472p@att.com>
2017-09-18VoLTE BPMN draft fileSeshu-Kumar-M3-0/+1145
Issue-ID: SO-46 Change-Id: I01b80c4eb5ee6c779dd95b840fa99a9bff0ad78e Signed-off-by: Seshu-Kumar-M <seshu.kumar.m@huawei.com>
2017-09-11Fix hardcoded orchestration-statusAbhishek Shekhar1-1/+2
While creating a service-instance orchestration-status is hardcoded to be Active. The user should be allowed to set the initial status. Issue-id: SO-108 Change-Id: Ica6febae1f7733125126b49f4f7e0e23bba2a0f2 Signed-off-by: Abhishek Shekhar <abhishek.shekhar1@amdocs.com>
2017-09-081710 Rebase - Second AttemptArthur Martella37-4407/+6626
This commit rebases changes from openecomp-mso/internal-staging-1710 up to and including this codecloud commit: 54483fc6606ddb1591a2e9da61bff8712325f924 Wed Sep 6 18:12:56 2017 -0400 Rebasing was done on a branch on top of this commit in so/master in ONAP: 93fbdfbe46104f8859d4754040f979cb7997c157 Thu Sep 7 16:42:59 2017 +0000 Change-Id: I4ad9abf40da32bf5bdca43e868b8fa2dbcd9dc59 Issue-id: SO-107 Signed-off-by: Arthur Martella <amartell@research.att.com>
2017-05-09[MSO-8] Additional fixes for the second rebaseDeterme, Sebastien (sd378r)16-4462/+4078
DB fixes + BPMN flows and groovy fixes + Fix issue with CloudConfig file not reloaded properly when it's wrong (JSON error or model hierarchy mistake) at MSO startup Change-Id: I2853030b78499e2a761706b643ea210955e72de3 Signed-off-by: Determe, Sebastien (sd378r) <sd378r@intl.att.com> [MSO-8] Restore files removed in patch set 2 Those groovy files must be there Change-Id: I9a47ac3d9c8fc06774a1b8f518491b1b0b00af04 Signed-off-by: Determe, Sebastien (sd378r) <sd378r@intl.att.com>
2017-05-02[MSO-8] Second step of the rebase for MSODeterme, Sebastien (sd378r)33-5616/+7939
Second rebase containing additional features for MSO + total reworking of the BPMN structure + Notification flow can now be added at the end of some BPMN flows Change-Id: I7e937c7a0ba1593ca85e164a093f79c7e38b6ce0 Signed-off-by: Determe, Sebastien (sd378r) <sd378r@intl.att.com>
2017-04-11[MSO-8] Update the maven dependencyxg353y35-0/+17027
Update the maven depenency for sdc-distribution-client to cooperate with the sdc changes. Change-Id: I2da936e5c40cb68c7181bb78307192dd5655b5dc Signed-off-by: xg353y <xg353y@intl.att.com>