aboutsummaryrefslogtreecommitdiffstats
path: root/platform-logic/generic-resource-api/src
AgeCommit message (Collapse)AuthorFilesLines
2017-10-11Fix underlay DG loading errorsramu.n4-1554/+1524
*Remove duplicate parameter names *Update 'error-message' parameter value Change-Id: Ia68fc3d0b5c850aec4776adc83e725fef52c52a3 Issue-Id: SDNC-117 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 04580d7eb6c59fdd613a8fea1d161e0ed7a46a1e
2017-10-10Fix for validate-network-inputGaurav Agrawal4-1036/+3066
Changes includes: 1) Fix an existing bug in validate-network-input because of which DG validation was failing. 2) validate-network-input to do nothing for overlay validation. 3) validate-network-input-parameter to validate network-id for deactivate flow. Change-Id: I424817ab20263633b8dacd3b3d672e63e3960f6d Issue-Id: SDNC-113 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: bf5801eae1015156972164d453dc737d63eeed95
2017-10-08Underlay delete flow DGs modification for VoLTEramu.n6-1657/+1922
*overlay delete operation validate network-id is received in the request and get network-topology-operation-input from this network-id *set oper-status Change-Id: I22291fbb34ca0d2ae51403ea27e5ca413141cb32 Issue-Id: SDNC-111 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: a8e7d59abcc55950e76f36cf4c2d280f55a38381
2017-10-05Deactivate flow modification for DCIGaurav Agrawal8-2105/+2455
Changes includes: 1) Save network information SDNC's MD-SAL data store 2) Send network-id & network-object-path in network-topology-operation-output 3) Deactivation based on stored network-id Change-Id: I4498d33e9e7921e047bfe9dff8c9801153f5f5f4 Issue-Id: SDNC-113 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: 4d38cecf0f03e1244ca0c605c5802632b36f3b82
2017-10-04Update underlay DGs for VoLTE use caseramu.n2-635/+791
*save network-topology-operation-input into SDNC's MD-SAL data store *send network-id & network-object-path in network-topology-operation-output Change-Id: I3649e3df0d857f0c8c62bdcb2e503a678f8b1814 Issue-Id: SDNC-111 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 0d34e8c6de21ffc32cd91f3eeaf9c342c7b0b091
2017-10-04Merge "Update plugin references"Dan Timoney2-261/+263
Former-commit-id: 3446c1d0ae16ec1c7aac1c3195ed58604afc568f
2017-10-04Update plugin referencesGaurav Agrawal2-261/+263
Following changes made for overlay deactivate 1) Updated record plugin to latest one. 2) Replace ecomp schema with onap. Change-Id: Ie8519613566b8938af8db8ade0ab70a79207bc07 Issue-Id: SDNC-105 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: fceb8a2083d4c0a52329fb4375874e96c5253715
2017-10-04Patched DCI overlay DG to main DGGaurav Agrawal4-723/+983
Changes includes: 1) Patched DCI overlay DGs with network-topology-operation DG. 2) Prefixed DCI overlay dg with dci-connects to avoid duplication with existing network-topology-operation-activate DG. Change-Id: I3b9f99fb5f1e5be27707aaa7c7b2dc9144c74398 Issue-Id: SDNC-110 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: bd0ebcc0e2f442233845fa6fe631c19173e8ac35
2017-10-03Update overlay DG for VoLTE use caseGaurav Agrawal4-615/+1238
1) Replace openecomp schema with onap 2) Get import/export rts from comma separated string 3) Replace tab with space Change-Id: I7025c6c89e74ab4ffefbab6eaf497c68ac333c9a Issue-Id: SDNC-105 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: 94d275c0b63b7a8d4e88303776edcbd82e681b8d
2017-09-29Update underlay DG for VoLTE use caseramu.n6-1396/+3476
*Replace openecomp schema with onap *fix plugin references *fix svc-action type issue *Add rest call for site & vrf configuration *Get ip-prfix & next-hop from route string Change-Id: I697fb76ab42a7fcb304df19733ac50eef7953f4f Issue-Id: SDNC-105 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 3948576d2ce46e492cfead3efd0aa883c280bd30
2017-09-28Added DG for overlay input validationGaurav Agrawal4-1265/+2743
Following changes are included: 1) Validated presence of mandatory input parameters 2) Validation of values for both sites. 3) Handling of l2 and l3. Change-Id: Ic01604f445b682494157f7358f2f4eed6b720b88 Issue-Id: SDNC-107 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: 39f275c0e95a08a41e9c84c8662288b5af1f36ec
2017-09-28Merge "Update DG network-topology-operation-deactivate"Dan Timoney4-379/+599
Former-commit-id: aa5d0ada80d9854beabbe52f82b16eb2f247aaa5
2017-09-28Update DG network-topology-operation-deactivateGaurav Agrawal4-379/+599
Following changes are included: 1) Handle l2 and l3 dci. 2) Fetch 3rd parth controller information using site-id. 3) Fetch siteId from parameter list. Change-Id: Ibd6b7520f96dbadcb2ffd440fe9687e86d7e558f Issue-Id: SDNC-104 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: 68505f52197cc6d7bbc804c9b9f38f3b8886fe66
2017-09-28Merge "Updated DG for network-topology-operation-activate"Dan Timoney4-765/+1343
Former-commit-id: 2ca3cb4819fb95c052d9ad60cd91a0cd316caa4c
2017-09-28Updated DG for network-topology-operation-activateGaurav Agrawal4-765/+1343
Following changes are included: 1) Handle l2 and l3 dci. 2) Handle 2 sites data keeping rest node template generic. 3) Fetch 3rd parth controller information using site-id. Change-Id: I6d075cab2c7850197d91bd4e707c10c579458d48 Issue-Id: SDNC-104 Signed-off-by: Gaurav Agrawal <gaurav.agrawal@huawei.com> Former-commit-id: 93b36edae1b14165ebd9c0fc9bbbe916c725790a
2017-09-28Merge "Update DG validate-network-input-parameters"Dan Timoney2-432/+1228
Former-commit-id: 3677f3cdd048c430de6c160517bb89e2f7acc2a0
2017-09-28Update DG validate-network-input-parametersMarcus G K Williams2-432/+1228
Added activate and deactivate svc-action for VoLTE overlay. Issue-Id: SDNC-28 Change-Id: I034658890bec7f19c08e35db2bcbaa20c2dc5a42 Signed-off-by: Marcus G K Williams <marcus.williams@intel.com> Former-commit-id: 05880a04310068ff77a385c691a43cecf9d43738
2017-09-28Modify DG for VoLTE use caseramu.n2-250/+348
Modify network-topology-operation DG to call network-topology-operation-create and network-topology-operation-delete sub DGs Change-Id: I3084d97143e6bb16986c1e1ea33738986c42640c Issue-Id: SDNC-27 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 24eb828a0a9f9506863c11e363bdaa6a58added4
2017-09-27Merge "Add VoLTE l3-dci-connects DGs + xml"Dan Timoney4-0/+1144
Former-commit-id: d5a73e9146c00ca18936a5d9d29668bbae72eeff
2017-09-27Add VoLTE l3-dci-connects DGs + xmlMarcus G K Williams4-0/+1144
Issue-Id: SDNC-28 Change-Id: I1e1eea6dc91d4ec7fd3cb159b557e33ebef13c92 Signed-off-by: Marcus G K Williams <marcus.williams@intel.com> Former-commit-id: 933ae5b147fc5c72aacc40a2255545efc8f2a7cd
2017-09-27Add DGs for VoLTE use caseramu.n4-2/+1329
Add network-topology-operation-delete sub DG for delete underlay L3VPN configuration Change-Id: Iba9380aaf33f48116fa46a416efff34c130cfc52 Issue-Id: SDNC-27 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 6cb45a1f39166566d0229e4dba430223a9877141
2017-09-27Merge "Add DGs for vCPE use case"Dan Timoney32-0/+1988
Former-commit-id: 5d890ae8e13a5a077470ca3cd86055d8a4a87c82
2017-09-27Add DGs for vCPE use caseDan Timoney32-0/+1988
Add new DGs needed to support vCPE use case Change-Id: I1717a3a1c49fedf5ec89667b22fee433429c42ed Issue-ID: SDNC-48 Signed-off-by: Dan Timoney <dtimoney@att.com> Former-commit-id: 26febb6f008e2cf9dc06a93b87885c8a37acce13
2017-09-27Merge "Add initial DG changes for underlay"Dan Timoney2-0/+115
Former-commit-id: 6b5bcd001e9997e5ce4142c6c5818c767b59a94e
2017-09-26Add sub DG for underlayramu.n2-0/+143
Add network-topology-operation-create sub DG for underlay L3VPN configuration Change-Id: I143fc60142b7da471c2142fc65e224c2712faf5e Issue-Id: SDNC-27 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 1d15c657de5910798e6dd93704ed820bd672a62c
2017-09-26Add initial DG changes for underlayramu.n2-0/+115
Add sub DG to validate underlay L3VPN input params Change-Id: I19d2860e3755528c0455c0f132be3d1872137a1f Issue-Id: SDNC-27 Signed-off-by: Ramu N <ramu.n@huawei.com> Former-commit-id: 55ada56e6632a4bae2dd88f243050c451e10f32d
2017-09-21Renamed ecomp-model-informationDan Timoney26-169/+169
Updated generic-resource-api DGs to reflect name change of ecomp-model-information to onap-model-information. This name change was missed in initial seed code submission, but is consistent with API doc published on ONAP wiki. Change-Id: I5cb95c98ed7c8748fcd2a607bee8b81a6166ae99 Issue-ID: SDNC-98 Signed-off-by: Dan Timoney <dtimoney@att.com> Former-commit-id: 979076e024b63ea7632c3cd57b8d62525482698d
2017-09-18Fixed accessing network-input-parameters.shashikanth2-779/+779
network topology operation assign sub DG access network-input-parameters as network-parameters which is not defined under network-request-input container in GENERIC-RESOURCE-API yang, modified network-topology- operation-assign.json as below Before: network-topology-operation-input.network-request-input. network-parameters After: network-topology-operation-input.network-request-input.network -input-parameters. jira.onap.org/browse/SDNC-87 Issue-Id: SDNC-87 Change-Id: Idd4005fb24365fef990284569dd23685590515b3 Signed-off-by: shashikanth.vh <shashikanth.vh@huawei.com> Former-commit-id: 89ac5158f33c5358d1a943a482f139e879dbd0a9
2017-09-06Add generic-resource-api DG seed codeDan Timoney103-0/+18174
Add seed code for generic-resource-api directed graphs. Change-Id: I51df937740d54d6f907c79fe322e4ffafe53537c Issue-ID: SDNC-45 Signed-off-by: Dan Timoney <dtimoney@att.com> Former-commit-id: b014b942536d93f55664b67a36436168e623bcec