aboutsummaryrefslogtreecommitdiffstats
path: root/docs/development/devtools/smoke/drools-smoke.rst
diff options
context:
space:
mode:
Diffstat (limited to 'docs/development/devtools/smoke/drools-smoke.rst')
-rw-r--r--docs/development/devtools/smoke/drools-smoke.rst61
1 files changed, 61 insertions, 0 deletions
diff --git a/docs/development/devtools/smoke/drools-smoke.rst b/docs/development/devtools/smoke/drools-smoke.rst
new file mode 100644
index 00000000..363bb503
--- /dev/null
+++ b/docs/development/devtools/smoke/drools-smoke.rst
@@ -0,0 +1,61 @@
+.. This work is licensed under a
+.. Creative Commons Attribution 4.0 International License.
+.. http://creativecommons.org/licenses/by/4.0
+
+.. _policy-api-smoke-testing-label:
+
+.. toctree::
+ :maxdepth: 2
+
+Policy Drools PDP and Applications Smoke Test
+~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
+
+The policy-drools-pdp smoke testing can be executed against a kubernetes based ONAP installation,
+and/or a docker-compose set up similar to the one executed by CSIT tests.
+
+General Setup
+*************
+
+ONAP OOM kubernetes
+-------------------
+
+For installation instructions, please refer to the following documentation:
+
+`OOM Documentation <https://docs.onap.org/projects/onap-oom/en/latest/>`_
+
+At a minimum policy needs the following components installed:
+
+- onap base charts
+- AAF for certificate generation
+- DMaaP message-router for communication among policy components.
+
+AAI, SO and other components can be simulated by installing the simulator charts:
+
+`Policy Simulator Helm Chart <https://github.com/onap/policy-docker/tree/master/helm/policy/components/policy-models-simulator>`_
+
+docker-compose based
+--------------------
+
+A smaller testing environment can be put together by replicating the CSIT test environment:
+
+`Policy CSIT Test infrastructure <https://github.com/onap/policy-docker/tree/master/csit>`_
+
+Testing procedures
+******************
+
+The smoke tests should be focused on verifying the proper workings of drools
+and dependent components. The following scenarios should be considered:
+
+- PDP-D registration with PAP.
+- PDP-D restarts and re-registration with PAP.
+- Proper workings of telemetry tool.
+- Exploration of correct PDP-D states with the telemetry tool.
+- Statistics and prometheus metrics.
+- Verify correct states of API, PAP, and controllers using the PDP-D healthchecks.
+- Verify distributed locking capability and proper use of the database.
+- Verify vCPE, vDNS, and vFirewall use cases and recorded metrics.
+
+The following testsuites contain everything necessary for the previous verifications:
+- `CSIT Robot framework <https://github.com/onap/policy-docker/blob/master/csit/resources/tests/drools-applications-test.robot>`_
+- `JMeter S3P <https://github.com/onap/policy-drools-applications/blob/master/testsuites/stability/src/main/resources/s3p.jmx>`_
+