Age | Commit message (Collapse) | Author | Files | Lines |
|
These reviews must be merged in order because of layering.
This review should be merged FOURTH
PLD added version.properties
Change-Id: If7af7b3ae37166e88af92c0d1f1c558e5b60ab8e
Issue-ID: POLICY-798
Signed-off-by: liamfallon <liam.fallon@ericsson.com>
Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>
|
|
Issue-ID: POLICY-736
Change-Id: I2bc455510e925764d18a1d8e96e072bdadb251c6
Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>
|
|
The following changes aim to have a quicker start of the drools container:
1. For both amsterdam (and the experimental beijing) controllers
dependencies are pre-installed, so the loading of 3rd party
dependencies are faster.
2. Further enhancements in installation.
3. Make sure that the naming of the generated control loop
artifacts have a "control loop" label associated with it,
so in the future, if other applications are added (non
control loop related) do not conflict and is clear.
Change-Id: Iecb84d186fcc34069aa5c4a175a8a4521b38499d
Issue-ID: POLICY-534
Signed-off-by: Jorge Hernandez <jh1730@att.com>
|