summaryrefslogtreecommitdiffstats
path: root/controlloop/common/eventmanager/src/test/resources
AgeCommit message (Collapse)AuthorFilesLines
2018-04-16Add missing license headersPamela Dragosh7-0/+85
I removed a couple of empty README and added licenses. Issue-ID: POLICY-741 Change-Id: I10aad3536d02b738a1dc606f7311de6b3a2777cd Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>
2018-02-08JUint/Technical Debt for eventmanagerliamfallon6-0/+160
Unit test expanded for SO POJOs, technical debt removed in eventmanager. Change-Id: I7045f5af88fd2c15019befe29a0b4fcd69801c49 Signed-off-by: liamfallon <liam.fallon@ericsson.com> Issue-ID: POLICY-455 Signed-off-by: liamfallon <liam.fallon@ericsson.com>
2017-10-25Fix Source/Target Lockdaniel1-1/+2
The locking of the target is now taken care of when the operation manager is initialized. This allows us to keep the template flow the same and to ensure that for vFW we will not lock the source if it is not intended to be the target. NOTE: This will have to be revised in the future if policy chaining will support having different targets specified for each policy in the chain. Additional work was done for hardening the APPC model code to make sure exceptions are caught and we gracefully end processing the event with memory clean up and a final failure notification sent. Issue-Id: POLICY-367 Change-Id: Ic796d95eb5400067744492f810dd8069ba6241b3 Signed-off-by: Daniel Cruz <dc443y@att.com> Signed-off-by: daniel <dc443y@att.com>
2017-07-20[POLICY-76] Remove/rename ATT internal stuffsGao, Chenfei (cg287m)1-7/+7
Change-Id: I3ec4fa22e22e9fccf4b6783b3bc8c92da25e181f Signed-off-by: Gao, Chenfei (cg287m) <cgao@research.att.com>
2017-06-29[POLICY-22] Reorganizing drools-appsGao, Chenfei (cg287m)1-0/+61
Change-Id: I5f9bb3908f8d55c466dd847ae5e01a424e9ba364 Signed-off-by: Gao, Chenfei (cg287m) <chenfei.gao11@gmail.com> Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>