summaryrefslogtreecommitdiffstats
path: root/controlloop/common/controller-beijing/pom.xml
AgeCommit message (Collapse)AuthorFilesLines
2018-05-21Update Drools Applcations to 1.2.3-SNAPSHOTliamfallon1-1/+1
These reviews must be merged in order because of layering. This review should be merged THIRD. Issue-ID: POLICY-844 Change-Id: I61d128f3244cd420abab15ab70c5c0e9d9afa625 Signed-off-by: liamfallon <liam.fallon@ericsson.com>
2018-05-16Upgrade SNAPSHOT to 1.2.2liamfallon1-1/+1
These reviews must be merged in order because of layering. This review should be merged FOURTH PLD added version.properties Change-Id: If7af7b3ae37166e88af92c0d1f1c558e5b60ab8e Issue-ID: POLICY-798 Signed-off-by: liamfallon <liam.fallon@ericsson.com> Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>
2018-04-13Exclude commons-collectionsPamela Dragosh1-0/+9
Since we are not using LDAP PIP we can get rid of this jar that has security issues. Issue-ID: POLICY-722 Change-Id: I93feacc8733a834866476db75933d8b2cf08c212 Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>
2018-04-13Update to SNAPSHOT 1.2.1Pamela Dragosh1-1/+1
Issue-ID: POLICY-736 Change-Id: I2bc455510e925764d18a1d8e96e072bdadb251c6 Signed-off-by: Pamela Dragosh <pdragosh@research.att.com>
2018-04-02installation enhancementsJorge Hernandez1-0/+171
The following changes aim to have a quicker start of the drools container: 1. For both amsterdam (and the experimental beijing) controllers dependencies are pre-installed, so the loading of 3rd party dependencies are faster. 2. Further enhancements in installation. 3. Make sure that the naming of the generated control loop artifacts have a "control loop" label associated with it, so in the future, if other applications are added (non control loop related) do not conflict and is clear. Change-Id: Iecb84d186fcc34069aa5c4a175a8a4521b38499d Issue-ID: POLICY-534 Signed-off-by: Jorge Hernandez <jh1730@att.com>