1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
|
.. This work is licensed under a Creative Commons Attribution 4.0
.. International License. http://creativecommons.org/licenses/by/4.0
.. Copyright 2017 AT&T Intellectual Property. All rights reserved.
.. _doc_guide_user_des:
Design
======
The goal of the design process is to create all artifacts (models)
that are required to instantiate and manage resources, services,
and products on the ONAP platform. The design process requires
input from users with multiple roles.
Design progresses logically through a series of phases. Each phase:
* is organized into steps that are completed in sequence
* is accessed using a different role with specific responsibilities
generates artifacts that are used in other phases of design or when
instantiating or monitoring virtual functions.
The following figure show the different phases and tools involved in
Onboarding, Design and Distribution process.
|image1|
**The "Core" Design Process includes the following steps:**
* Pre-Onboarding
A VNF/PNF Provider delivers VNF descriptor, model and
artefacts (e.g. HEAT template), which will be validated
and packaged for onboarding to ONAP
* (Resource)-Onboarding
In the SDC a License Model is created, the VNF/PNF package imported
and a Vendor Software Product (VSP) is created
* VF Creation and Testing
A V(N)F, PNF or CR Model is created (a) import of a VSP or VFC
(b) manual creation and import of artefacts created via external
tools like the Controller Design Studio (CDS), responsible for the
Controller Blueprint Design
The created VF will pass a testing workflow to be used
in a Service Model
* Service Design
A Service Model is created as a composition of resources
(e.g. V(N)Fs, PNFs,...), Policies, Workflows,...
The created Service Model will pass a testing workflow and
handed over to a Governance Approval and Distribution process
* Governance Approval and Distribution
The Service Provider will have a specific set of policies and
procedures for approving Services and deploying them in the
Runtime Service Catalog
**The optional/additional Design steps are:**
* Controller Blueprint Design
The Controller Blueprint is the overall service design, fully model-driven,
intent based package needed for self service provisioning and configuration
management automation. The framework to automate the resolution of resources
for instantiation and any config provisioning operation,
such as day0, day1 or day2 configuration.
It provides a tool called Controller Design Studio
* Policy Design
The Policy Creation component deals with policies.
These are rules, conditions, requirements, constraints, attributes,
or needs that must be provided, maintained, and/or enforced.
At a lower level, Policy involves machine-readable rules enabling
actions to be taken based on triggers or requests.
* APPC Controller Design
APPC Controller Design Tool (CDT) is used for self-service onboarding of
VNF’s. VNF owners can create templates and other artifacts for APPC
Configure command (used to apply a post-instantiation configuration)
as well as other life cycle commands.
* Workflow Design
The purpose of the Workflow Designer is to enable designers to define or
modify workflows to support Service/Resource change management scenarios
executed by the Service Orchestrator.
* Control Loop Design
This phase includes the Design of a closed loop template and associate it
to a Service. The template represents the theoretical flow of the CL.
It generates a deployment artifact that can be ingested by the DCAE in
order to create the needed DCAE microservices in runtime.
The design is done in the SDC DCAE-DS (Design Studio).
The DCAE Design Studio enables to define and configure
the monitoring flows of DCAE.
The configuration and deployment of a Control Loop will be done with
Control Loop Automation Management (CLAMP) tool.
The follwing sections will focus on the different Design steps:
.. toctree::
:maxdepth: 1
:titlesonly:
Pre-Onboarding <./pre-onboarding/index.rst>
Resource-Onboarding <./resource-onboarding/index.rst>
VF Creation and Testing <./vfcreation/index.rst>
Service Design <./service-design/index.rst>
Governance Approval and Service Distribution <./service-distribution/index.rst>
Controller Blueprint Design <../../../submodules/ccsdk/cds.git/docs/index.rst>
Policy Design <../../../submodules/policy/parent.git/docs/design/design.rst>
APPC Controller Design <../../../submodules/appc.git/docs/APPC CDT Guide/APPC CDT Guide.rst>
Workflow Design <../../../submodules/sdc.git/docs/workflow.rst>
Control Loop Design <../../../submodules/sdc.git/docs/dcaedesigner.rst>
Control Loop Automation Management <../../../submodules/clamp.git/docs/index.rst>
.. |image1| image:: media/Design-Overview.png
|