Age | Commit message (Collapse) | Author | Files | Lines |
|
Fix architecture func diagram and its description
Issue-ID: DOC-736
Signed-off-by: byungwoojun <byung-woo.jun@ericsson.com>
Change-Id: I83fe2908e1537595e29f1f18c2a789c5172ebe19
|
|
Updated architecture descrition to add CPS for Honolulu
Issue-ID: DOC-734
Signed-off-by: byungwoojun <byung-woo.jun@ericsson.com>
Change-Id: Iea30427ec85edc43d728f8302d972003e59e57ec
|
|
Update content for Guilin
Update figure (provided by Architectue sub-committee)
Add new section for CDS
Issue-ID: DOC-695
Signed-off-by: Eric Debeau <eric.debeau@orange.com>
Change-Id: Ia3c09e9fd47068feb9c28311be875491e6508abd
|
|
Issue-ID: DOC-688
Signed-off-by: Kanagaraj Manickam <kanagaraj.manickam@huawei.com>
Change-Id: Ica9f5bf7ab98b9f4b3401754798a9b8213e3fa4e
|
|
Update with last figure for Architecture
Update figure for 5G
Add figure for MDONS
Update width for figures
Remove references to Release
Remove media files no more used
Align content with Marketing team
- Add section on End to End Tests
- Add MDONS Blueprint
- Update Modeling section
Add HTML links to blueprints
Issue-ID: DOC-633
Signed-off-by: Eric Debeau <eric.debeau@orange.com>
Change-Id: I2443bbf092fa43e055f4c7775bc8f3583f57c636
|
|
Issue-ID: DOC-564
Signed-off-by: Eric Debeau <eric.debeau@orange.com>
Change-Id: I2fe6a7c140248ad6c0df8bce75b2e6370ac7e5c0
|
|
Update Architecture figure as defined by Architecture subcommittee
Update text aligned with document produced by Marketing and Architecture
Add links to Yourube and Youku
Issue-ID: DOC-469
Signed-off-by: Eric Debeau <eric.debeau@orange.com>
Change-Id: I077ba9e747d52853d7e5b9d3209f2cfedf143302
|
|
BBS blueprint description in onap developer guide, architecture section
Issue-ID: DOC-432
Change-Id: Ibf08ec9b58b96b1671b2ce302c37fd19b8edbedb
Signed-off-by: Pérez Caparrós David, INI-INO-ECO-HCT <David.PerezCaparros@swisscom.com>
|
|
Update architecture section with the architecture white-paper
Add new files for new blueprints (5G and CCVPN)
Issue-ID: DOC-363
Change-Id: I35b7633e71407b59b9f96ed5adf5814c7935341a
Signed-off-by: Eric Debeau <eric.debeau@orange.com>
|
|
Issue-ID: DOC-275
Change-Id: I5d0ac386de0692ce39f5b2f9f156d7553f494a3a
Signed-off-by: Chris Donley <christopher.donley@huawei.com>
|
|
Replace top-level architecture diagram with TSC-approved version
Issue-ID: DOC-180
Change-Id: I3a30472f2b4b5be89ccc17b4d56be4f988630bfb
Signed-off-by: Chris Donley <christopher.donley@huawei.com>
|
|
This submission is an RST version of the onap architecture whitepaper for the Amsterdam release. It includes the main file plus 5 pngs referenced in the paper. To Do: update ONAP-toplevel.png when I get the revised version from LF.
Issue-ID: DOC-151
Change-Id: I24a875589e32b738793ed6bb6bb01271f6123d73
Signed-off-by: Chris Donley <christopher.donley@huawei.com>
|