summaryrefslogtreecommitdiffstats
path: root/docs/submodules/so.git
diff options
context:
space:
mode:
authorBorislav Glozman <Borislav.Glozman@amdocs.com>2018-05-23 18:12:31 +0000
committerGerrit Code Review <gerrit@onap.org>2018-05-23 18:12:31 +0000
commit4f3192b83681c2de4bae400a2f10534d499cb42b (patch)
tree45c37bc2802e36b64dfdbec08faf59a863607f9e /docs/submodules/so.git
parentbf3a23227992f50ce3a582d1046545effe40cdb1 (diff)
Updated git submodules
Project: oom master 3ddc57909299d76cee0e67e59aa7b52d3bd1401c Merge "Increase portal-db initial liveness probe time" Increase portal-db initial liveness probe time The most recent TLAB OOM Portal deployment failed due to the portal-db initialization being terminated at the 5 minutes mark. Bumping the probe initial delays even higher. Change-Id: I6904fe7c4dd894725b7febcceab07a80e348a69e Issue-ID: PORTAL-283 Signed-off-by: Gary Wu <gary.i.wu@huawei.com>
Diffstat (limited to 'docs/submodules/so.git')
0 files changed, 0 insertions, 0 deletions