From 72322e8a3823b823f9398fd99f2f99b5adba1871 Mon Sep 17 00:00:00 2001 From: "stark, steven" Date: Thu, 29 Mar 2018 12:54:39 -0700 Subject: VNFRQTS Template for VNF Test Descriptions Adding initial documents for documenatation build Adding template for VNF Test Descriptions Change-Id: I4b45a30c63edf5ce90060ce94185af72429c78d4 Issue-ID: VNFRQTS-53 Signed-off-by: stark, steven --- docs/Chapter1.rst | 88 +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 88 insertions(+) create mode 100644 docs/Chapter1.rst (limited to 'docs/Chapter1.rst') diff --git a/docs/Chapter1.rst b/docs/Chapter1.rst new file mode 100644 index 0000000..87313a9 --- /dev/null +++ b/docs/Chapter1.rst @@ -0,0 +1,88 @@ +.. This work is licensed under a Creative Commons Attribution 4.0 International License. +.. http://creativecommons.org/licenses/by/4.0 +.. Copyright 2017 AT&T Intellectual Property. All rights reserved. + + +**VNF Package Test Cases** +========================== + +VNF Package Information Element Present +--------------------------------------- + +Summary +^^^^^^^ + +This test case validates whether information elements corresponding to VNF requirements are present in the VNF Package + +ONAP Actors (VNF, Operator, ONAP Platform components etc.) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. VNF Package +2. VNF Requirements +3. ONAP Information Model + +Preconditions (ONAP, VNF states, test equipment/ data patterns, measurements) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. VNF Package available +2. VNF Requirements related to VNF Package identified (Mandatory or Optional) +3. Information Elements corresponding to these VNF Package requirements identified + +Operational sequence (e.g. Message Sequence chart + text explanations) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. Search the VNF Package for the Presence/ Absence of each Information Element identified in the VNF Package requirements. +2. Flag as an error any Mandatory information Elements that are missing +3. Report and optional Information Elements that are present. + +Post conditions (any post processing of the measurements, any cleanup of the ONAP configuration, reset of the test equipment etc.) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. Generate consolidated report on presence/Absence of Information Elements identified in VNF Requirements + +Test Result decision ( measurement decision criteria ) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. Fail if and Mandatory Information Elements are Absent. + + +VNF Package Information Element within Range Limits +--------------------------------------------------- + +Summary +^^^^^^^ + +This test case validates whether information elements corresponding to VNF requirements are present in the VNF Package + +ONAP Actors (VNF, Operator, ONAP Platform components etc.) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. VNF Package +2. VNF Requirements +3. ONAP Information Model + +Preconditions (ONAP, VNF states, test equipment/ data patterns, measurements) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. VNF Package available +2. VNF Requirements related to VNF Package identified (Mandatory or Optional) +3. Information Elements corresponding to these VNF Package requirements identified +4. Range Limits for Information Elements identified + +Operational sequence (e.g. Message Sequence chart + text explanations) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. Search the VNF Package for the Presence/ Absence of each Information Element identified in the VNF Package requirements. +2. Flag as an error any Mandatory information Elements that are missing + +Post conditions (any post processing of the measurements, any cleanup of the ONAP configuration, reset of the test equipment etc.) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. Generate consolidated report on presence/Absence of Information Elements identified in VNF Requirements + +Test Result decision ( measurement decision criteria ) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +1. Fail if and Mandatory Information Elements are Absent. + + -- cgit 1.2.3-korg